China made in china Supplier CNC Aluminum7075 Machining Mechanical Spare Parts

China  made in china Supplier CNC Aluminum7075 Machining Mechanical Spare Parts

Maintaining in mind that great services is the crucial to cooperating with consumers, we attempt to meet large top quality specifications, offer competitive rates and make certain prompt delivery.

Materials

one. metal:Aluminum/Steel/Alloy steel/Stainless steel/Brass,copper,bronze and so on.

two. plastic: Abs,POM,PE,PP,PVC,Laptop,PMMA,Teflon,nylon etc.

three. other individuals: carbon fiber, glass,fiberglass, wooden, tough rubber and many others.

Colour

Silver, Gray, Black ,Gold or as client’s need

Floor Roughness

Ra0.eight ( without sharpening or grinding)

Brand Strategy

laser engraving, CNC engraving, display screen-printing and so forth.

Area Finish 

Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect.

Tolerance 

+/- .01–.05mm / can also be tailored

Certification

ISO SEPG

Processing equipments

CNC machining center,NC lathe, Grinding machine, Automated lathe machine, Standard lathe device,Milling equipment,Drilling device,EDM,Wire-slicing equipment,CNC bending device etc

Testing equipment

Coordinate measuring device,Impression measuring instrument,Caliper and so forth

Software

Health care Devices/Electronic/ Industrial// Automation / motorcycle/3D printer

Services

OEM,ODM or as client’s necessity

Packaging & Delivery
Packaging Details
1. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and many others. 
2. outer packaging: carton box, picket circumstance, plate and so on. 
3. as for every customers’ need
Port
xiamen, or as client’s necessity
Direct Time :

Quantity(Items) 1 – 20 21 – 100 one zero one – 1000 >1000
Est. Time(times) five ten twenty five To be negotiated

 

Trade Conditions FOB, CIF, EXW
MOQ 1Pcs
Port xiamen, or as client’s necessity
Transport By air  (DHL,UPS,Fedex,EMS etc.),By Sea,Convey…
Payment Approach T/T(financial institution transfer),L/C,paypal,western union, moneygram,escrow, cash and so on
Payment Conditions fifty% just before production, 50% just before delivery
Packing inner box,numerous boxes/learn carton or as customer’s necessity
Supply time  5-7days for Alanple time,five-twenty five times for production

If there is anything I can aid, make sure you come to feel totally free to get in touch with with me
   Telephone: 18060902874

 

Tags:

Recent Posts