We – EPG Team the largest worm gearbox, couplings and gears factory in China with 5 diverse branches. For more particulars: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828 /
Technical data listing:
Sort: | Worm Equipment Velocity Reducer |
Model: | NMRV571–a hundred and fifty |
Ratio: | 1:7.5,ten,fifteen,twenty,25,thirty,40,50,60,eighty,100 |
Coloration: | Blue/Silver Or On Consumer Ask for |
Content | Housing: Blue-Coloured Cast-Iron Worm Equipment-Copper-ten-3# Worm-20CrMn Ti with carburizing and quenching, surface area harness is 56-62HRC Shaft-chromium steel-45# |
Lubricant: | Synthetic&Mineral |
Bearing: | C&U Bearing |
Seal: | NAK SKF |
Warranty: | -thirty-40°C |
ICE FLANGE | 80B5,90B5,100B5,112B5,132B5,160B5 |
Rated energy: | .06KW,.12KW,.25KW,.75KW,1.5KW,3KW,5.5KW,7.5KW |
Software | Metallurgical machinery, food equipment, stage equipment, welding machinery, road machinery, amusement equipment, packaging equipment, Rubber and plastic machinery, environmental defense machinery ,engineering machinery, development machinery, equipment device industry, automotive industry, logistics and transportation and so on |
NMRV | PAM | N | M | P | D | |||||||||||
ICE | 5 | 7.five | ten | 15 | 20 | 25 | thirty | 40 | fifty | sixty | 80 | one hundred | ||||
twenty five | 56B14 | 50 | sixty five | 80 | 9 | 9 | nine | nine | nine | nine | 9 | nine | nine | |||
30 | 63B5 | 95 | 115 | a hundred and forty | 11 | 11 | eleven | eleven | eleven | eleven | 11 | 11 | eleven | |||
63B14 | sixty | 75 | 90 | |||||||||||||
56B5 | 80 | one hundred | 120 | nine | 9 | 9 | nine | nine | nine | 9 | 9 | 9 | nine | 9 | ||
56B14 | fifty | 65 | eighty | |||||||||||||
40 | 71B5 | a hundred and ten | one hundred thirty | a hundred and sixty | fourteen | fourteen | 14 | fourteen | 14 | 14 | fourteen | fourteen | ||||
71B14 | 70 | 85 | 105 | |||||||||||||
63B5 | ninety five | 115 | one hundred forty | eleven | eleven | 11 | eleven | eleven | 11 | 11 | eleven | eleven | 11 | eleven | eleven | |
63B14 | 60 | seventy five | 90 | |||||||||||||
56B5 | eighty | a hundred | a hundred and twenty | nine | 9 | 9 | 9 | |||||||||
50 | 80B5 | 130 | 165 | two hundred | 19 | 19 | 19 | 19 | 19 | 19 | 19 | |||||
80B14 | 80 | a hundred | one hundred twenty | |||||||||||||
71B5 | a hundred and ten | 130 | one hundred sixty | fourteen | fourteen | 14 | 14 | fourteen | 14 | 14 | 14 | fourteen | fourteen | 14 | ||
71B14 | 70 | 85 | a hundred and five | |||||||||||||
63B5 | 95 | 115 | 140 | eleven | 11 | eleven | 11 | eleven | ||||||||
63 | 90B5 | one hundred thirty | one hundred sixty five | 200 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
90B14 | 95 | one hundred fifteen | one hundred forty | |||||||||||||
80B5 | one hundred thirty | one hundred sixty five | two hundred | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | ||||
80B14 | 80 | one hundred | one hundred twenty | |||||||||||||
71B5 | 110 | one hundred thirty | one hundred sixty | fourteen | fourteen | fourteen | 14 | 14 | ||||||||
71B14 | 70 | 85 | one zero five | |||||||||||||
75 | a hundred/112B5 | a hundred and eighty | 215 | 250 | 28 | 28 | 28 | |||||||||
100/112B14 | a hundred and ten | a hundred thirty | 150 | |||||||||||||
90B5 | one hundred thirty | one hundred sixty five | 200 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
90B14 | ninety five | a hundred and fifteen | a hundred and forty | |||||||||||||
80B5 | one hundred thirty | 165 | 200 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | |||||
80B14 | 80 | one hundred | 120 | |||||||||||||
71B5 | one hundred ten | one hundred thirty | 160 | 14 | fourteen | fourteen | 14 | |||||||||
90 | one hundred/112B5 | a hundred ninety | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | ||||||
one hundred/112B14 | 110 | one hundred thirty | one hundred sixty | |||||||||||||
90B5 | one hundred thirty | 165 | 200 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||
90B14 | 95 | a hundred and fifteen | 140 | |||||||||||||
80B5 | one hundred thirty | a hundred sixty five | two hundred | 19 | 19 | 19 | 19 | 19 | ||||||||
80B14 | 80 | one hundred | one hundred twenty | |||||||||||||
110 | 132B5 | 230 | 265 | three hundred | 38 | 38 | 38 | 38 | ||||||||
one hundred/112B5 | one hundred eighty | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | ||||
90B5 | one hundred thirty | one hundred sixty five | 200 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
80B5 | a hundred thirty | 165 | 200 | 19 | 19 | |||||||||||
130 | 132B5 | 230 | 265 | three hundred | 38 | 38 | 38 | 38 | 38 | 38 | 38 | |||||
100/112B5 | a hundred and eighty | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | ||||||
90B5 | one hundred thirty | a hundred sixty five | 200 | 24 | 24 | |||||||||||
150 | 160B5 | 250 | three hundred | 350 | 42 | forty two | forty two | 42 | 42 | |||||||
132B5 | 230 | 265 | 250 | 38 | 38 | 38 | 38 | 38 | 38 | |||||||
a hundred/112B5 | one hundred eighty | 215 | 200 | 28 | 28 | 28 | 28 |
Elements:
1. Housing: Die-solid Aluminum Alloy Gearbox (RV571~RV090)
Forged Iron Gearbox (RV110~RV150)
2. Worm Wheel: Wearable Tin Bronze Alloy, Aluminum Bronze Alloy
three. Worm Shaft: 20Cr Steel, carburizing, quenching, grinding, surface hardness fifty six-62HRC, .3-.5mm remaining carburized layer after exact grinding
4. Input Configurations:
Geared up with Electric powered Motors (AC Motor, Brake Motor, DC Motor, Servo Motor)
IEC-normalized Motor Flange
Sound Shaft Input
Worm Shaft Tail Extension Input
five. Output Configurations: Keyed Hollow Shaft Output
Hollow Shaft with Output Flange
Plug-in Reliable Shaft Output
six. Spare Components: Worm Shaft Tail Extension, Solitary Output Shaft, Double Output Shaft, Output Flange, Torque Arm, Dust Cover
7. Gearbox Painting:
Aluminum Alloy Gearbox:
Soon after Shot Blasting, Anticorrosion Therapy and Phosphating, Paint with the Shade of RAL 5571 Gentian Blue or RAL 7035 Light Gray
Forged Iron Gearbox:
Following Painting with Pink Antirust Paint, Paint with the Coloration of RAL 5571 Gentian Blue
Workshop demonstrate
FAQ
Q1. What is your conditions of packing?
A: Generally, we pack our products in single shade box. If you have specific request about packing, pls negotiate with us in progress, we can pack the merchandise as your ask for.
Q2. What is your conditions of payment?
A: T/T thirty% as deposit, and 70% before shipping. We’ll present you the photos of the merchandise and packages
just before you spend the stability. Other payments terms, pls negotiate with us in progress, we can talk about.
Q3. What is your phrases of supply?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Typically, it will take twenty five to thirty times soon after getting your ept payment. The specific supply time depends
on the objects and the amount of your purchase.
Q5. Can you produce in accordance to the samples?
A: Of course, we can make by your samples or technical drawings. We can create the molds and fixtures.
Q6. What is your sample coverage?
A: We can supply the sample if we have ready areas in stock, but the consumers have to pay the sample expense and
the courier cost.We welcome sample get.
Q7. Do you test all your items before shipping?
A: Yes, we have a hundred% check just before shipping
Q8: How do you make our business prolonged-phrase and great romantic relationship?
1. We preserve great high quality and competitive cost to guarantee our consumers reward
2. We regard every single client as our good friend and we sincerely do enterprise and make pals with them,
no issue the place they come from.
/ The use of first equipment manufacturer’s (OEM) portion figures or trademarks , e.g. CASE® and John Deere® are for reference reasons only and for indicating product use and compatibility. Our firm and the outlined substitute parts contained herein are not sponsored, accredited, or made by the OEM. /